Electrical supply design, switchboard, pumps and fabricated SS suction and discharge pipework by Whelans.
All installation works completed with one week ahead of heavy rainfall weather event.
Electrical supply design, switchboard, pumps and fabricated SS suction and discharge pipework by Whelans.
All installation works completed with one week ahead of heavy rainfall weather event.
Electrical supply design, switchboard, pumps and fabricated SS suction and discharge pipework by Whelans. All installation works completed with one week ahead of heavy rainfall weather event.
Pump Station PGS215 – Installation of pumps and pipework for Sewerage Pump Station at a new residential subdivision in Peregian Springs.
New Unitywater sewage pump station for a civil contractor as part of a large industrial property development at Burpengary – MOR028. Supply and installation of variable speed drive control switchboard and submersible pumps and pipework.
Relocated Unitywater pump station switchboard to allow for the expansion of the Kings Beach Surf Club building including relocation of the power supply.
Major upgrade of Unitywater pump station catering for industrial estate at Coolum. Whelans supplied and installed new 75kW variable speed drive switchboard and telemetry. Our works included bypassing of the pump station during the works which included, replacement of internal pump discharge stands, riser pipework and commissioned new replacement pumps. Photos show old switchboard being […]
Our Mechanical crew are refurbishing the actuators and gearboxes for the Pelican Waters Navigational Boat Lock installed by us in 2006. All the internal grease is replaced and they are yet to be repainted.
Sep 2017 – Hayden Cook completed one of the dimensionally largest switchboards we have ever built this week. It has 7 tiers and is 6M long. Well done Hayden and your team. Excellent job. Oct 2017 – The large SEQWATER switchboard being craned onto our truck. It’s now installed on site at Narangba awaiting commissioning […]
Oct 2017 – We attended the Adventure Park at outer Geelong to commission the Switchboard and Starters we provided for their amazing new Tornado Water Slide.
Jan 2017 – One of our larger pump stations has just been commissioned by our excellent team. Our scope included the switchboard building completed yet again by Matt Sheard of Mategra Developments and the Odour Control Units and plumbing as shown in the photos. Another great job team.
Jan 2018 – Ben and his team today commissioned the new Petrie High Level Zone Variable Speed Water Pump Station. Photos show the Pumps, our Switchboard, Security and Fire Systems, which were all part of our scope. Our company has almost completed all of the electrical works for the shutdown of the Petrie Water Treatment […]
Dec 2016 – One of the bigger pumps we’ve installed over the years, Brightwater Salinity Control Pump, broke down just in time for us to install the replacement on the last day before our Christmas shutdown.
Installation of Power Factor Correction Units at various large Unitywater Pump Stations to bring about power cost savings . Various locations including Kallangur (KAL001); Warana (KAW001); Sippy Downs (MTN043) and Noosaville (NVL010).
Whelan Electrical have supplied and installed the pump control switchboard, pumps and pipeworks for the Caloundra Landfill Leachate Transfer Pump Station.
Whelan’s were contracted in a major upgrade of pump station NVL010 Juron Street, Noosaville.
Whelan Electrical Services installed the complete lighting and electrical works for the new Maroochy Shire Council Multisports Complex at Fishermans Road Maroochydore.
A project that required considerable travel was a recent project at Blacks Beach Cove Estate Mackay.
In 2007,Whelan Electrical Services supplied the Control Switchboard, all recirculation pumps and waste water pump station to the new Water Park at the Adventure Park outside Geelong Victoria.
Whelans have completed numerous switchboard replacement projects for Gold Coast City Council over the past years.
The Salinity Pump Station for Kawana lake features two axial flow pumps delivering 1700 L/S to the Parreara Lake system to maintain water quality.
Our company was responsible for the complete design and installation of a high tech hydroponics facility including 800 AMP main switchboard.