Sep 2017 – Hayden Cook completed one of the dimensionally largest switchboards we have ever built this week.  It has 7 tiers and is 6M long.  Well done Hayden and your team.  Excellent job.

Oct 2017 – The large SEQWATER switchboard being craned onto our truck. It’s now installed on site at Narangba awaiting commissioning later this month. The crew have performed terrifically during such a busy period – they love all the overtime.

Jan 2018 – Ben, Hayden and their team have also completed the Offtake Valve Controls for water from the Northern Interconnect pipeline for supply to Narangba when Petrie Water Treatment Plant is shutdown.

[/et_pb_text][/et_pb_column][/et_pb_row][/et_pb_section]

Sep 2017 – Hayden Cook completed one of the dimensionally largest switchboards we have ever built this week.  It has 7 tiers and is 6M long.  Well done Hayden and your team.  Excellent job.

Oct 2017 – The large SEQWATER switchboard being craned onto our truck. It’s now installed on site at Narangba awaiting commissioning later this month. The crew have performed terrifically during such a busy period – they love all the overtime.

Jan 2018 – Ben, Hayden and their team have also completed the Offtake Valve Controls for water from the Northern Interconnect pipeline for supply to Narangba when Petrie Water Treatment Plant is shutdown.