Another great installation by Ben, Hayden and the team.

Again Matt Sheard of Mategra Developments supplied the new building for the Switchboard and Variable Speed Drives at an existing major pump station at Sandstone Point.  Matt also provided the enclosure over the existing generator.

This installation was quite involved as it is a fully operational pump station and Shayne devised a lot of integration planning around not interfering with operational works of the station.

Well done again Team.